Load Testing for Cranes
  • Review crane specifications and load charts

  • Assess ground and foundation conditions

  • Define test load cases and positions

  • Install settlement and tilt monitoring devices

  • Apply test loads in controlled manner

  • Monitor ground settlement continuously

  • Observe any distress or instability

  • Compare measured values with allowable limits

  • Repeat testing for critical load positions

  • Analyze performance under load

  • Assess safety and stability

  • Confirm compliance with standards

  • Document observations and data

  • Prepare load test certification report

Load testing for cranes verifies that ground conditions, foundations, or support platforms can safely sustain crane operations. This is critical in construction sites or industrial areas in Sri Lanka where cranes lift heavy materials, and foundation failure could lead to catastrophic consequences.

The test involves applying controlled loads to simulate crane operation while monitoring settlement, tilting, and ground behavior. Sensors record displacement and rotation to ensure loads remain within safe limits. Multiple load positions and operating conditions are tested for a comprehensive evaluation.

A detailed report provides performance assessment, safety confirmation, and recommendations for operational limits. This testing ensures safe crane operation, prevents accidents, and maintains compliance with regulatory and engineering standards.